Malaysia · Palm Oil Mill Effluent · Biogas Safety

Engineered biogas flare packages for POME treatment projects.

BIOTAN supports palm oil mills, local EPC contractors, and biogas developers with a focused package for safe gas handling—from preliminary selection and drawings to equipment supply and commissioning support.

Final sizing and safety design are confirmed by an engineer after project data review.

BIOTAN biogas flare and gas-handling installation at a wastewater treatment facility
Focused equipment scope Flare · water seal · gas separation · controls
MalaysiaRelevant wastewater equipment supply experience
POMEPurpose-built gas-handling project intake
EPC SupportSelection, drawings, tender data, and commissioning

A Clear First Scope

Control and dispose of anaerobic POME biogas safely.

Anaerobic treatment of palm oil mill effluent produces methane-rich biogas. When the gas cannot be fully used by an engine, boiler, or upgrading system, a dependable flare and correctly arranged upstream equipment provide a controlled disposal route.

BIOTAN packages the flare with the gas-handling components needed around it, giving mill owners and EPC teams one coordinated equipment scope instead of separate loose items.

POME Biogas Safety Package

One coordinated package, configured around your operating data.

Stainless steel water-seal tank for a biogas line
Upstream protection

Water-Seal Tank

A liquid seal component configured for the selected gas line and operating arrangement.

Three-phase separator equipment for anaerobic treatment
Gas conditioning

Gas-Liquid Separation

Upstream separation and drainage provisions to reduce liquid carryover toward the flare train.

Anaerobic reactor for high-strength industrial wastewater
Optional integration

Anaerobic System Interface

Coordination with covered lagoons, UASB, IC, EGSB, and other anaerobic treatment arrangements.

Relevant Export Experience

A practical equipment partner for Malaysian wastewater projects.

BIOTAN has previously supplied biogas handling and anaerobic treatment equipment for Malaysian wastewater projects, including equipment applied to palm oil wastewater.

Project-specific client names, operating figures, and performance data are shared only when disclosure is permitted. We do not invent project results or claim data that has not been verified.

How We Work

From first data review to project support.

  1. 01Share project data

    Send the available mill, POME, gas, pressure, and operating information.

  2. 02Clarify the duty

    We identify missing inputs, operating cases, interfaces, and the required equipment boundary.

  3. 03Preliminary configuration

    Receive a proposed package scope for technical discussion and budget planning.

  4. 04Engineering confirmation

    Final equipment selection follows engineer review, agreed standards, and approved project data.

Prepare for a Useful Review

Project information that helps us respond accurately.

Send what you already have. Missing items can be identified during the first review.

01Mill capacity

FFB processing capacity and operating schedule.

02POME flow

Average and peak wastewater flow, if available.

03Existing process

Open lagoon, covered lagoon, UASB, IC, EGSB, or other system.

04Biogas flow

Normal, minimum, maximum, and emergency flare cases.

05Gas composition

CH₄, CO₂, H₂S, moisture, and other known constituents.

06Pressure

Available pressure and expected pressure variation at the package inlet.

07Gas use

Power generation, boiler, Bio-CNG, or flare-only operation.

08Project location

State, site conditions, delivery destination, and project schedule.

Free Preliminary Project Review

Tell us what you know about the POME and biogas system.

We will review the submitted information, identify important missing inputs, and respond with the next technical questions for a preliminary package discussion.

Lillian Wang · International Business Development sales.waterprocessgroup@gmail.com WhatsApp: +65 8887 0524

This form provides preliminary project intake only. Final engineering is subject to technical review.